Major structural repairs to stabilise
the roof that was slowly moving. Main chainbon timbers at the eaves
were removed and in filled with brickwork. Stainless steel straps
were tied to roof and walls and the canopy at the front tied back
to the rafters. Once this was complete replaced all damaged fibrous
plaster mouldings and redecorated all disturbed areas including main
church ceiling.